Most homeowners with a house and off-street parking do not need EV charger planning permission for a wall-mounted charger, because the work usually falls under permitted development. Fitting one typically costs £960 including VAT, and most jobs fall between £720 and £1,300. The exceptions are flats, listed buildings, conservation areas and homes where the council has removed the right.

When EV charger planning permission is not needed

For a house with its own parking, a wall-mounted charger normally falls under permitted development. Limits apply to its size and to how far it can stick out, and a unit on a wall next to a road is more restricted. The Planning Portal’s guidance on EV chargers lists the current limits. The rules changed recently, so read the page rather than relying on an older guide.

A charger on a side or rear wall is less likely to cause a problem than one on the front of the house.

When EV charger planning permission is needed

You are likely to need permission if any of these apply:

  • Your home is a flat or a maisonette, where permitted development rights are narrower.
  • The home sits in a conservation area or has listed status.
  • The council has removed the right with an Article 4 direction.
  • There is no off-street parking, so the charger would serve a space on the road.
  • You want a freestanding charger post rather than a wall unit, which has limits of its own.

Ask your council or check the Planning Portal before you order. If you want certainty, you can apply for a lawful development certificate, which confirms in writing that the council accepts the work.

Advertisement

EV charger planning permission and the electrics

Planning is only one part of the job. A charger also needs a safe electrical supply, and the installer should check the consumer unit and the earthing first. If the board has no room or is too old, you may need a new consumer unit, and that adds to the cost. Our charger with a new consumer unit guide prices it at £1,500.

What to ask the installer

  • Does the charger fall within permitted development at my address?
  • Who checks the supply, the consumer unit and the earthing?
  • Will the work be certified, and who notifies the network operator?
  • Where will the cable run, and does it cross a path?

Our EV charger installation guide has the full checklist. Use the quote checker to see whether a price is in the usual range, and read about EV charger costs for the other job in this service.