Block paving cost
40 m² of block paving typically costs £3,800 in the UK, with most jobs between £2,800 and £6,800. That works out at about £95 a square metre, laid. That includes VAT at 20%. There is no grant for this work, so the figure above is what you would actually pay.
- Per square metre£95
- Most people pay£3,800
- VAT20%
- On site3–5 days
What you would actually pay
Typical 40 m² of block paving · UK- Typical installed cost Block paving, supplied and fitted
- £3,167
- VAT at 20% Standard rate
- £633
- Net cost to you
- £3,800
If you borrowed £3,800.00 over 36 months at 0.0%, it would cost £105.56 a month – £3,800.00 in total, of which £0.00 is interest. The last payment would be £105.40.
Illustration only – not a quote, not an offer of credit, and not financial advice. Rates depend on your circumstances and creditworthiness.
Block paving cost: where the money goes
| Element | Per square metre |
|---|---|
| Standard concrete blocks The common 200 by 100 block in a handful of colours. Fades over ten to fifteen years, which shows most where a car does not sit. | £70 – £100 |
| Premium or textured concrete blocks Tumbled edges and through-colour mixes. Holds its appearance longer than the standard block and lays the same way. | £80 – £150 |
| Clay blocks The colour is fired in, so it does not fade at all. Harder, more brittle to cut, and the most expensive of the three. | £120 – £170 |
Guide prices including VAT, per square metre laid. The totals above are for about 40 square metres. Your actual cost depends on your property, access and specification.
What should be in a quote
If a quote is missing any of these, ask why before you compare it with another.
- Excavation depth and disposal of the spoil
- The sub-base depth, which differs for a driveway and a patio
- Edge restraints, and whether they are haunched in concrete
- The laying course: sharp sand, screeded to depth
- The block, named by make and colour, and the pattern it is laid in
- Vibrating in and sanding the joints, and a second pass after settlement
What moves the cost of block paving
- Laying pattern
A herringbone pattern interlocks the blocks far more tightly than a stretcher bond, so it holds up to cars turning and braking. It takes longer to lay and produces more cuts at the edges, and on anything a vehicle uses it is worth the difference.
- Block material
Clay costs more than concrete and keeps its colour indefinitely. Concrete fades, gradually and unevenly.
- Area and access
A large, open, regular area is cheaper per square metre than a small or awkward one. Cuts around manholes, steps and curved edges are where the labour goes.
- Removing the old surface
Breaking out an existing concrete or tarmac driveway and taking it away is charged by weight, before a single block is laid.
What has happened to material prices
Between September 2021 and September 2026, concrete products rose 51%, cement 28% and natural stone 15%, against 28% for prices in general.
Block paving, slabs and kerbs are concrete products, natural stone is priced separately, and every job uses cement in the bedding and pointing. These are the prices British manufacturers charge, before the merchant's margin and the installer's labour are added.
- Concrete products Up 51%
- Natural stone Up 15%
- Cement Up 28%
- Prices in general Up 28%
Show the figures
| Prices of | Since Sep 2021 | Past year |
|---|---|---|
| Concrete products | Up 51% | Up 3% |
| Natural stone | Up 15% | Up 3% |
| Cement | Up 28% | Up 1% |
| Prices in general | Up 28% | Up 3% |
Source: Office for National Statistics, Producer price index C2361, concrete products for construction; Producer price index C2370, cut, shaped and finished stone; Producer price index C2351, cement; Consumer prices index, all items. Figures to September 2026, published 21 October 2026. Producer and import prices are what manufacturers charge and importers pay, before the merchant's and installer's margins. Contains public sector information licensed under the Open Government Licence v3.0.
Common questions
How long does block paving last?
Twenty to twenty-five years on a properly built sub-base before it needs lifting and relaying. On a thin or poorly compacted base it will rut and sink much sooner, whatever the blocks cost.
Does block paving need sealing?
No, but it helps. Sealing makes oil and leaf stains easier to lift and keeps the colour looking fresher. It needs redoing every few years, and it has to go on to a dry, fully cured surface.
Will weeds grow through it?
In the joints rather than through the blocks. Sweeping, and re-sanding the joints every few years, deals with most of it. Weeds appearing in numbers usually mean the jointing sand has washed out.
Block paving cost by region
Get quotes for your home
A guide price only takes you so far. Local firms can price the work on your own home, and comparing a few quotes is the quickest way to see what is reasonable.
Compare free quotes