New roof cost
A new roof typically costs £9,000 in the UK, with most jobs between £4,500 and £18,000. That includes VAT at 20%. There is no grant for this work, so the figure above is what you would actually pay.
- Typical range£4,500–£18,000
- Most people pay£9,000
- VAT20%
- On site5–10 days
What you would actually pay
Typical 3-bed semi · UK- Typical installed cost New roof, supplied and fitted
- £7,500
- VAT at 20% Standard rate
- £1,500
- Net cost to you
- £9,000
If you borrowed £9,000.00 over 36 months at 0.0%, it would cost £250.00 a month – £9,000.00 in total, of which £0.00 is interest.
Illustration only – not a quote, not an offer of credit, and not financial advice. Rates depend on your circumstances and creditworthiness.
New roof cost: where the money goes
| Element | Typical range |
|---|---|
| Scaffolding Up for the duration of the job, and priced by the week on longer ones. | £720 – £1,500 |
| Stripping the old covering Including skips and disposal, which is charged by weight. | £600 – £1,400 |
| Felt, battens and fixings The layer that actually keeps the water out. | £480 – £1,200 |
| Tiles or slates Concrete is cheapest; clay and natural slate cost considerably more. | £1,500 – £9,000 |
| Ridge, hips and flashing Leadwork around chimneys and valleys, and dry-ridge systems. | £600 – £2,200 |
| Timber repairs Only known once the roof is stripped, which is why quotes carry a provisional sum. | £0 – £2,500 |
Guide prices including VAT. Your actual cost depends on your property, access and specification.
What should be in a quote
If a quote is missing any of these, ask why before you compare it with another.
- Scaffolding, and how long it stays up
- Stripping and disposing of the old covering
- The exact tile or slate, named by make and model
- New felt and battens, not reusing the old
- Leadwork to chimneys, valleys and abutments
- What happens if the timbers turn out to be rotten
- Guarantee length, and whether it is insurance-backed
What moves the cost of new roof
- The covering you choose
Concrete tiles are the cheapest option by some distance. Clay adds roughly half again, and natural slate can double the material cost on the same roof.
- What is under the tiles
Rotten battens or rafters are invisible until the roof is stripped. A good quote says what the hourly rate is for replacing them rather than pretending it will not happen.
- Access
A terrace with no side access, a three-storey property, or anything needing a scaffold over a pavement all add cost before a single tile is lifted.
- Roof shape
Valleys, dormers, hips and chimneys each need cutting and leadwork. A simple gable roof is far quicker than the same area broken up by detail.
Why roofing quotes have risen
Between September 2021 and September 2026, clay tiles and bricks rose 61%, concrete products 51% and home repair work 6%, against 28% for prices in general.
A roofer's quote is mostly labour and materials. Concrete and clay tiles are both made in Britain, so what the manufacturers charge feeds through the merchant to your quote. The cost of a tradesperson's time has moved on its own course.
- Clay tiles and bricks Up 61%
- Concrete products Up 51%
- Home repair work Up 6%
- Prices in general Up 28%
Show the figures
| Prices of | Since Sep 2021 | Past year |
|---|---|---|
| Clay tiles and bricks | Up 61% | Up 4% |
| Concrete products | Up 51% | Up 3% |
| Home repair work | Up 6% | Up 1% |
| Prices in general | Up 28% | Up 3% |
Source: Office for National Statistics, Producer price index C2332, bricks, tiles and construction products in baked clay; Producer price index C2361, concrete products for construction; Consumer prices index 04.3.2, services for maintenance and repair of the dwelling; Consumer prices index, all items. Figures to September 2026, published 21 October 2026. Producer and import prices are what manufacturers charge and importers pay, before the merchant's and installer's margins. Contains public sector information licensed under the Open Government Licence v3.0.
Common questions
How long does a re-roof take?
Five to ten working days for a typical semi-detached, weather permitting. Scaffolding usually goes up a day or two before and comes down a few days after, so allow a fortnight from start to clear site.
Do I need planning permission?
Not usually for a like-for-like replacement, which counts as permitted development. You will need it if the property is listed or in a conservation area, or if you are changing the roof line or the material to something visibly different.
Should I repair or replace?
If the covering is sound and the problem is localised, a repair costing a few hundred pounds can buy another ten or fifteen years. Once you are patching the same roof two or three times a year, or the felt has perished across a whole slope, replacing usually works out cheaper.
Why is there VAT on this when heat pumps are zero-rated?
Zero-rating applies to energy-saving materials. An ordinary re-roof is charged at the standard rate, as set out under What you would actually pay, above. If you add insulation or solar as part of the same job, that element may be treated differently, so ask your roofer to itemise it.
New roof cost by region
Get quotes for your home
A guide price only takes you so far. Local firms can price the work on your own home, and comparing a few quotes is the quickest way to see what is reasonable.
Compare free quotes