MOT Type 1 calculator
Use this free MOT type 1 calculator to work out what to order from your own measurements. Enter the area and the compacted depth you need to see how many tonnes of Type 1 to order. The figure allows for compaction, so it covers the finished depth rather than the depth you tip.
m
m
mm
About 75 to 100 mm under a patio or path, 150 mm or more under a drive.
%
2.7 tonnes of MOT Type 1 sub-base, including 5% extra
- Area
- 12 m²
- Volume to fill
- 1.26 m³
How the MOT type 1 calculator works it out
- Multiply the length by the width for the area, then by the depth for the volume to fill.
- Add the extra for waste, spillage and uneven ground.
- Multiply by the weight of the material: about 2.1 tonnes per cubic metre for MOT Type 1 sub-base.
What we assume
| MOT Type 1 sub-base, compactedOrdered loose, but it compacts down; this is the compacted figure, so the tonnage covers the finished depth. | 2.1 t/m³ | Total Calc Hub, UK aggregate calculator |
|---|
Published figures vary between suppliers and products. Where the bag, tin or roll you are buying states its own coverage or weight, use that.
Advertisement
MOT Type 1 calculator questions
- What is MOT Type 1?
- Crushed stone graded from dust up to about 40 mm, which locks together when compacted into a firm base. It is the standard sub-base under UK patios, paths and drives.
- How do I compact Type 1?
- In layers no thicker than about 100 mm, with a plate compactor, which most hire shops have. Run over each layer several times until it no longer moves underfoot.
What the job costs
- Patio costA 20 m² patio typically costs £2,800 including VAT.
- Driveway costA 40 m² driveway typically costs £3,600 including VAT.
- Block paving cost40 m² of block paving typically costs £3,800 including VAT.